01 Ready to work
First, provide a copy of the technical personnel to the "equipment before the installation preparatory work," the smooth operation of the equipment into the plant, the installation;
02 Training
Two, training the technical parameters of the technical personnel, the process control, the actual operation of the equipment, the actual operation and the daily maintenance, maintenance method, etc.;
03 Acceptance
Three, the installation and commissioning of the equipment, we have a copy of the installation and acceptance report, the customer signature, feedback equipment to improve the problem, service issues;
04 Regular return visit
05 Complaints and Suggestions